Joely Rodriguez Behind Schedule
Joely Rodriguez (ankle) is reportedly a bit behind schedule, according to Levi Weaver of The Athletic. Rodriguez pitched in 12 games last year for the Rangers, posting a 2.13 ERA with 17 strikeouts. A strong 2020 season could propel Rodriguez into a larger role in 2021, though the injury setback could be a slight roadblock. The Rangers have the least-settled bullpen situation in the AL West, so keep an eye on Rodriguez, even if he doesn't open the season in a fantasy-relevant role.
Source: The Athletic - Levi Weaver
Texas Rangers pitcher Source: The Athletic - Levi Weaver

Read More News